09. 22. 2020
News from the construction site
First floor perimeter walls have been built for the first houses of stage 4 of Na Malé Růži while ceilings are being constructed.
Back to ListingFirst floor perimeter walls have been built for the first houses of stage 4 of Na Malé Růži while ceilings are being constructed.
Back to Listing